Implementation Guide
PowerSchool
Student Information Syst
Document Properties
|
Copyright |
©
2002 Apple Computer, Inc. All rights reserved. This document is the property
of Apple Computer, Inc. and is for reference only. It is not to be reproduced
or distributed in any way without the express written consent of Apple
Computer, Inc. Other brands and names are the property of their respective
owners. |
|
Owner |
Technical
Communication and Documentation |
|
Last
Updated |
3/11/2002 |
|
Version |
2.0.9.0 |
|
Implementation Contact Information |
PowerSchool,
A Division of Apple 80
Iron Point Circle, Suite 2000 Folsom,
CA 95630 Main:
(801) 614-7097 |
Contents
Thank you for choosing PowerSchool, the leading Web-based student information system, as your schoolís software solution.
To ensure that the implementation process flows smoothly, there are a few things PowerSchool and your school should have in place. The following is a task list to facilitate a successful implementation.
To convert your school to PowerSchool, PowerSchool requires the school to dedicate resources to the implementation process. It is necessary for the school to designate a project leader. This individual serves as the schoolís liaison to the PowerSchool Implementation Team.
Depending on the size of the school and the number of schools involved in the implementation, you might also need to assign a dedicated core group of individuals to assist the project lead. The project lead works with the core group members at your school to ensure that tasks have proper resources allocated to them and that they are completed correctly and in a timely manner. The PowerSchool Implementation team can help your school to determine the number of staff members at the school who should be involved in the implementation process.
As part of the initial assessment, you need to participate in an introductory conference call or invite a PowerSchool Implementation Specialist to visit the school.
The primary goal of the assessment is to introduce the PowerSchool Implementation Specialist to your schoolís project lead and core group. This call or visit provides an opportunity to examine the specifics of the implementation process at your school.
Issues to be discussed during the initial assessment include:
… An overview of PowerSchool and its features.
… Firewall and connection issues.
… Internet connection to the site.
… Timbuktu installation by school for support and product installation.
… Implementation process (Installation Guide).
… Data conversion.
… Teacher access to the Internet from a workstation in the classroom.
… Roles and Responsibilities.
For more information on the initial assessment, see Attachment A.
The project lead should recognize some of the implementation constraints to better establish an accurate timeline for your school.
Consider the following issues when establishing the implementation timeline:
… Hardware Procurement.
… Network Infrastructure.
… Availability of personnel resources.
… Complexity of conversion effort.
… Timing of school scheduling activities.
… Experience and availability of users.
Using the information gathered from this document, as well as all of the above information, PowerSchool will work with your school to determine an appropriate timeline for your implementation. The PowerSchool Implementation Team takes into account the resources available at the school, as well as here at PowerSchool. The PowerSchool Implementation Specialist will contact you to discuss this document and the timeline according to your schoolís needs and resources.
For more information on establishing a timeline, see Attachment B.
The Installation Guide is available online at: http://www.powerschool.com/support/installguide.
You need your customer number and password to access the site. If you do not have a customer number and password, you may request one at:
The following are topics covered in the PowerSchool Installation Guide:
… Purchase & Prepare.
… Install Timbuktu.
… Initiate the Installation.
… Getting Started.
… System Settings.
… School Setup.
… Data Entry.
… Elementary School Setup.
… Importing & Converting Data.
… Teacher Preparation.
… Where to Go Next.
… Schedule On-Site Training.
… Contacting Your School Community Coordinator.
PowerSchool has created sample reports to meet schools' needs. The reports listed below are reviewed during the initial assessment visit or conference call to see if they are adequate for your facilities or if changes are required. Schools can request a cost estimate for customizations to their reports or procedures:
… Report
card formats.
… School
transcript formats.
… State
attendance reports.
… Custom
pages.
For more information on Report Customizations, see Attachment C.
Read this Assessment Survey prior to your assessment visit or conference call. Be prepared to answer each of these questions; your PowerSchool Implementation Support Specialist will address them.
1. How many schools are to be setup on PowerSchool?
… How many elementary schools?
… How many secondary schools?
2. How many total students?
… How many elementary students?
… How many secondary students?
3. What type of school are you? (Public, Private, Vocational, Other)
… If you select ìOtherî, please specify the type of school.
4. Is the school a year-round school?
1. Do you have a district technology administrator?
2. Do you have someone designated to oversee the installation and setup of PowerSchool (Project Lead)?
3. Do you currently have a Student Information System (SIS) administrator?
4. Who will be the PowerSchool Administrator at the school?
5. How many people are committed to the implementation project?
6. How would you rate your level of technical expertise (1 to 5, 5=Expert) with the following:
… Configuring a computer to accept an IP address, and broadcast it on the Internet?
… Working through firewall and/or proxy issues?
… Troubleshooting abilities (hardware)?
… Troubleshooting abilities (software)?
… Can you export data (as a test file) from your current SIS or database system?
… Can you analyze data manipulation in an Excel spreadsheet?
1. Do you have a router?
… If yes, do you have direct access to configure the router?
2. Do you have a firewall?
… If yes, do you have direct access to configure the firewall?
3. What type of Internet connection to you have coming into the school?
… Do all the teachers and office staff have a computer on their desks from which they can access the Internet?
… If not, what percentage of faculty and staff has an Internet connection?
… How soon do you project the rest of the faculty and staff will have this connection?
4. Do you prefer a Windows 2000 or Mac OS 9 solution for your PowerSchool server?
5. Do you have a former SIS?
… What is that system?
… How long have you been on that system?
6. Do you require PowerSchool to do the data conversion?
7. Do you require on-site assistance to do the setup and conversion?
8. How soon do you need to be implemented?
1. How soon do you need to have initial training after implementation?
2. How many administrators require training?
… How would you rate the average administratorís technical abilities or training needs?
3. How many teachers require training?
… How would you rate the average teacherís technical abilities or training needs?
4. How many secretaries, registrars and ancillary persons require training?
… How would you rate the average secretaryís technical abilities or training needs?
5. Will the users be using Macs or PCs during the training?
6. Will we be training all teachers or training the in-school trainers?
|
Date |
Task |
Description of
Task |
Responsible
Party |
|
|
Attend assessment meeting or conference call. |
Using the Implementation Guide, the school and PowerSchool complete an implementation assessment, project overview, and break down roles and responsibilities for each party. |
School and PowerSchool |
|
|
Order hardware, and set up network and Internet connection. (Step 1 issues) |
Order required hardware for PowerSchool implementation. (Ensure schoolís network is operational). Obtain IP address. Review Internet connection requirements. |
School |
|
|
Prepare for PowerSchool Installation. (Step 2 and Step 3) |
Assemble hardware. Install Timbuktu. Request installation of PowerSchool. |
School |
|
|
Confirm configuration validity. |
School and PowerSchool work through firewall and IP issues
to establish Internet connectivity. |
School and PowerSchool |
|
|
Install PowerSchool on server. |
Place product on server. Verify connectivity inside and outside of firewall (for staff and parent access). |
PowerSchool |
|
|
Log on to PowerSchool and perform initial setup. (Step 4 and Step 5) |
Create personal logon. Setup required users. Configure system settings. |
School |
|
|
Enter the School Setup information in PowerSchool. (Step 6) |
Enter information on the School Setup page in PowerSchool. |
School and PowerSchool (as needed) |
|
|
Convert and import data into PowerSchool. (Step 7 and Step 8) |
School is responsible for migrating data from prior system. The PowerSchool Implementation team offers assistance (email and phone service) during data conversion process. Online templates are available as a guide for field processing. Data conversion by PowerSchool is offered as a contracted service, provided data is in ASCII, tab-delimited format. |
School and PowerSchool (as needed) |
|
|
Download PowerGrade and appropriate manuals. (Step 9) |
Download PowerGrade for setup on training workstations and teacher workstations. |
School |
|
|
Download Adobe Acrobat and supplemental documentation. |
Download Adobe Acrobat and the PowerSchool Userís Guide and the PowerGrade Manual. Distribute as needed. Explore the PowerSchool Help site. |
School |
|
|
Final check of school setup and implementation. |
Implementation manager confirms all things are in order for recommendation to Training. PowerSchool sends confirmation that process is complete and that the school may request training. |
PowerSchool |
|
|
Request training. |
Submit request for training to PowerSchool Training department. |
School |
|
|
Fundamentals Training. |
PowerSchool trains school on fundamentals with their final PowerSchool data. (PowerSchool conducts initial on-site training). |
PowerSchool |
|
|
Go live with PowerSchool. |
After installation and initial training, school can begin using PowerSchool. |
School |
|
Ongoing |
Address support issues. |
After school is trained, the PowerSchool Technical Support group addresses all support issues. |
PowerSchool |
|
Ongoing |
Provide training. |
Based on your school's needs, PowerSchool can provide additional training. Contact PowerSchool Training department for a list of training topics. |
PowerSchool |
Complete this form to request a report customization.
Date: __________________________
School Name: _______________________________________
Requestor: __________________________________________
Report Requested: ____________________________________
Date Report is Needed: ________________________________
Please list the specific report details as you would like them to appear:
Note: Please attach a copy of the current report, with
the modifications you are requesting documented on the report, and submit to
PowerSchool via fax, e-mail, or US mail.
|
List of Report Details |
|
|
|
|
|
|
|
|
Requestor Signature:
___________________________________ Date: __________________
|
For PowerSchool use only: Completed By: ____________ Date: _______________ Track #: _____________ Completed On: _______________ |
# Of Hours: _________ Cost: $_________ Invoice
#: _______________ |